AAC Blocks (Autoclaved Aerated Concrete Blocks) Fly Ash Based

PROJECT DESCRIPTION

Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a singlecomponent building material AAC has achieved acceptance in new markets throughout the world. The AAC has the features of light bulk density good thermal insulation properties and sound absorption, certain strength and process ability, and its raw materials is very rich, especially the reuse of fly ash enables the comprehensive utilization of industrial residue curbs environmental pollution no destroy on farmland create good social and economic benefits. AAC is an ideal alternative of the traditional clay brick wall materials. AAC Blocks have Good heat insulation and humid retention. They are non-flammable. Autoclaved Aerated Concrete (AAC) products are 4 times lighter in weight than ordinary concrete. Its characteristic structure comprising millions of tiny pores, it offers optimum solidity at low weight. Uses and Applications AAC products are equally suitable for residential construction, multistory buildings commercial and industrial construction. The products are made of natural materials: sand lime and water. These raw materials are processed to provide a building material with a large number of air pores; hence, aerated concrete. Fine pores (nearly 70% of the product) and the solid structure of calcium silicate hydrate gives AAC its exceptional material properties. They are fire proof and provide insulation. Its low density permits use in larger building units which serves as a distinct advantage in pre fabrication. Appreciable savings are effected in foundation loads in multi storeyed construction. It is therefore being used increasingly as walling units in some developed countries. Market Survey The autoclaved aerated concrete sector of the construction industry is now in the phase of a tremendous growth cycle. The autoclaved aerated concrete industry must utilize competitive techniques as customers are looking for lowered costs. AAC is not a new building system but it is new to India. Autoclaved aerated concrete (AAC) though relatively unknown in India is currently one of the many building products being touted as green or environmentally friendly. There will be phenomenal growth in autoclaved aerated industry in the near future. Autoclaved aerated concrete blocks having different architectural finishes and color will also play a prominent role in near future. With a high growing good infrastructure and urbanization, the autoclaved aerated concrete Industry is poised for growth in the near future.


Tags

 

AAC Autoclaved Aerated Concrete Blocks, AAC Block making machine, aac block manufacturing plant cost, aac block manufacturing process, AAC Block Manufacturing Unit, aac block mini plant, aac block plant project feasibility study, aac block plant project report, AAC Block Production Line, AAC Block Project Report, aac block raw material proportion, AAC Blocks making machine factory, AAC Blocks Making Small Business Manufacturing, AAC Blocks Manufacturing Industry in India, AAC Blocks Manufacturing Plant & Suppliers in India, aac blocks manufacturing plant cost, AAC blocks manufacturing process, aac blocks manufacturing process project report, AAC Blocks Manufacturing Projects, AAC Blocks Manufacturing Unit, AAC Blocks Product Processing, aac blocks project cost, AAC Blocks Raw Materials‎, aac blocks specifications, AAC Blocks, Autoclaved Aerated Concrete Blocks in India, AAC Blocks Manufacturing Business, AAC Manufacture, Autoclave Aerated Concrete AAC Production Line, Autoclaved Aerated Concrete AAC blocks Project, Autoclaved aerated concrete manufacturing process, Best small and cottage scale industries, Business consultancy, Business consultant, Business Plan for a Startup Business, Business start-up, Consulting Services to set up AAC blocks projects, Detailed Project Report on AAC Blocks Manufacturing unit, Download free project profiles on AAC Blocks Production plant, Feasibility report on AAC Blocks Manufacturing plant, Feasibility study for AAC project line, Feasibility study for setting up a new autoclaved aerated concrete block, Fly ash aerated project report, Fly ash Based Small Scale Industries Projects, Fly ash Processing & Fly ash Based Profitable Projects, Free Project Profiles on AAC Blocks Manufacturing plant, Great Opportunity for Startup, How to make aac block, How to start a successful AAC Blocks Manufacturing business, How to Start AAC blocks Manufacturing Industry in India, How to Start Autoclave Aerated Concrete blocks manufacturing unit?, How to Start AAC Blocks Production Business, Industrial Project Report, Light weight brick process, Modern small and cottage scale industries, Most Profitable AAC Blocks Manufacturing Business Ideas, New small scale ideas in AAC Blocks Manufacturing industry, Niir, NPCS, Pre-Investment Feasibility Study on AAC Blocks Production plant, Preparation of Project Profiles, Process technology books, Production process of AAC Autoclave Aerated Concrete blocks, Profitable small and cottage scale industries, Profitable Small Scale Autoclave Aerated Concrete blocks Manufacturing, Project consultancy, Project consultant, Project for startups, Project identification and selection, Project profiles on AAC Blocks Manufacturing unit, Project report on AAC Blocks Manufacturing industries, Project Report on AAC Blocks Production plant, Project Report on autoclaved aerated concrete blocks, Setting up and opening your Autoclave Aerated Concrete blocks Manufacturing Business, Setting up of AAC Blocks Manufacturing Units, Small Capacity AAC Block Plant, Small Scale AAC Blocks Manufacturing Projects, Small scale AAC Blocks production line, Small scale Commercial AAC Blocks making, Small Start-up Business Project, Startup India, Stand up India, Starting a AAC Blocks Manufacturing Business, Startup, Start-up Business Plan for AAC Blocks Production plant, Startup ideas, Startup Project, Startup Project for AAC Blocks Manufacturing plant, Startup project plan, Techno-Economic feasibility study on AAC Blocks Production unit, What is AAC Block?, What is Autoclaved Aerated Concrete Blocks?

PROJECT AT A GLANCE
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary& Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** **********
TOTAL ********** ********** ********** TOTAL ********** ********** **********
COST OF PROJECT
Particulars Existing Proposed Total
C O S T O F P R O J E C T
Land & Site Development Exp.
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PROFITABILITY AND NET CASH ACCRUALS
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
ASSSESSEMENT OF WORKING CAPITAL REQUIREMENTS
Particulars Stk.Prd. Stk.Prd. Operating Years
1st Year 2nd Yr&+ 1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** ********** **********
Cash/Bank Balances ********** ********** ********** ********** **********
Gross Wkg. Capital ********** ********** ********** ********** **********
********** ********** ********** ********** **********
PROFITABILITY RATIOS, DSCR, DEBT EQUITY
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales
Gross Profit ********** ********** ********** ********** **********
% Of G.P. to Net Sales ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales ********** ********** ********** ********** **********
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations
Repayment of Long/Medium Ter ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
Parameters
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital excl Unsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering
i.e.Total Term Lia./NW
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** **********
Assets Turnover Ratio (x) ********** ********** ********** ********** **********
No. of Shares of 10.00 each ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in `) ********** ********** ********** ********** **********
Proposed divident ********** ********** ********** ********** **********
Cash EPS (in `) ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in `) ********** ********** ********** ********** **********
Payout Ratio (%Age) ********** ********** ********** ********** **********
Retained Earnings/Share (in `) ********** ********** ********** ********** **********
Retained Earnings (%Age) ********** ********** ********** ********** **********
Book Value Per Share (in `) ********** ********** ********** ********** **********
Debt Per Share (in `) ********** ********** ********** ********** **********
Probable Mkt.Price/Share(in `) ********** ********** ********** ********** **********
Price / Book Value (x) ********** ********** ********** ********** **********
Price Earnings Ratio (x) ********** ********** ********** ********** **********
Yield (%Age) ********** ********** ********** ********** **********
BREAK EVEN ANALYSIS
Particulars Operating Years
Ratio 1-2 2-3 3-4 4-5 5-6
BREAK EVEN ANALYSIS
Total Value of Output ********** ********** ********** ********** **********
Variable Cost & Expenses
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total ********** ********** ********** ********** **********
Less:W.I.P. Adjustments ********** ********** ********** ********** **********
Total Variable Cost ********** ********** ********** ********** **********
Net Contribution ********** ********** ********** ********** **********
Profit Volume Ratio (%) ********** ********** ********** ********** **********
Semi-Var./Semi-Fixed Exp.
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** **********
**********
Fixed Expenses / Cost **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** **********
Cash Break Even Sales ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** **********
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
M E A N S O F F I N A N C E

Equity Share Capital

********** ********** **********

Others - Preference Share Capital

********** ********** **********
Total Equity Share Capital ********** ********** **********
********** ********** **********

Long/Medium Term Borrowings

********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
********** ********** **********

Total Means of Finance

********** ********** **********
INTEREST AND REPAYMENT ON TERM LOANS
A Name of Institution-Bank ABC BANK
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.
F Rate of Interest(General) xxxx% p.a.
F Rate of Interest(Initial) 0.00% p.a.
G Apply Gen. Int. Rate from Year x Quarter :: x
H Interest Calculation Quarterly
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations ********** ********** ********** ********** **********
Repayment of Long/Medium Term ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
DEPRECIATION CHARGES AS PER BOOKS (TOTAL)
Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building - Office Buildings PLANT & MACHINERY Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures
1-2 ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
Type A :: Buildings
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
Type C
Office Vehicles WDV ********** **********
Type D :: Misc. Fixed Assets
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
Projected Pay Back Period
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********
Total Initial Investment *********
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV ********* *********
IRR ********* *********
PROJECTED BALANCE SHEET
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
A S S E T S ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********
COMPANY SUMMARY

NIIR PROJECT CONSULTANCY SERVICES (NPCS)is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

REASONS FOR BUYING THE REPORT
  1. This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  2. This report provides vital information on the product like its definition, characteristics and segmentation.
  3. This report helps you market and place the product correctly by identifying the target customer group of the product.
  4. This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  5. The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
OUR APPROACH
  1. Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  2. The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  3. We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.
TABLE OF CONTENT
Introduction
Project Introduction
Project Objective and Strategy
Concise History of the Product
Properties
BIS (Bureau of Indian Standards) Provision & Specification
Uses & Applications

Market Study and Assessment
Current Indian Market Scenario
Present Market Demand and Supply
Estimated Future Market Demand and Forecast
Statistics of Import & Export
Names & Addresses of Existing Units (Present Players)
Market Opportunity

Raw Material
List of Raw Materials
Properties of Raw Materials
Prescribed Quality of Raw Materials
List of Suppliers and Manufacturers

Personnel (Manpower) Requirements
Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery
List of Plant & Machinery
Miscellaneous Items
Appliances & Equipments
Laboratory Equipments & Accessories
Electrification
Electric Load & Water
Maintenance Cost
Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations
Detailed Process of Manufacture with Formulation
Packaging Required
Process Flow Sheet Diagram

Infrastructure and Utilities
Project Location
Requirement of Land Area
Rates of the Land
Built Up Area
Construction Schedule
Plant Layout and Requirement of Utilities

FINANCIAL PLAN
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR
INFORMATION/ DISCLAIMER
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
AAC BLOCKS (AUTOCLAVED AERATED CONCRETE BLOCKS) FLY ASH BASED
Capacity 150000 M3/Annum Plant and Machinery cost 1100.00 Lakhs
Working Capital 0.00 Rate of Return (ROR) 44.00 %
Break Even Point (BEP) 53.00 % TCI 1790.00 Lakhs
Cost of Project 1790.00Lakhs
Add to Inquiry Basket Download Page as PDF.

AAC Blocks (Autoclaved Aerated Concrete Blocks) Fly Ash Based
Capacity 500 CUM/Day Plant and Machinery cost 1117.00 Lakhs
Working Capital 0.00 Rate of Return (ROR) 36.00 %
Break Even Point (BEP) 39.00 % TCI 1886.00 Lakhs
Cost of Project 1886.00Lakhs
Add to Inquiry Basket Download Page as PDF.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR